Four disciplines, one load calculation.
Each discipline loads a circuit differently, and calculating them apart is how a job ends up under one generator and over another.
Audio
A console, amp rack and stage boxes pull close to the same wattage from downbeat to strike — a steady load rather than a spiking one, and usually the smallest of the four on a general session. What changes the number is zone count and headcount together: a distributed system covering several zones off separate amps needs more circuits than one line array covering a single space, even where the two draw a similar total.
- Load shapeSteady, low relative to video and lighting
- Scales withZone count, not headcount alone
Video & LED
A screen, a projector or a wall does not draw a fixed number — it draws what the content asks of it, and a full-white slide or a bright sponsor reel is the heaviest frame in the show. That is why a wall or a large screen is specified from its published maximum draw rather than its average, and why the circuit count on a video-heavy general session is usually set by this line before audio or lighting are even totaled.
- Load shapeSpikes with content, not a fixed rating
- Specified fromThe maximum draw, not the average
Lighting
A wash-only rig for a single speaker draws far less than an intelligent rig cued for a multi-segment general session, and the difference is fixture count and how hard each one works, not the size of the space. Moving heads pull more than static fixtures at the same output, and a programmed show with fast cues asks more of a dimmer than one look held for an hour.
- Load shapeSet by fixture count and cue complexity
- Scales withThe program, not the space
Staging & scenic power
Motor rigging, power tools during load-in and any powered scenic element are a separate draw from the show itself — heaviest before doors open and largely gone once the audience is in the room. A build day with motors running and tools on site can pull more than the show it is building toward, which is why the load-in window gets its own circuit rather than sharing the show’s.
- Load shapeHeaviest during build, not during the show
- WatchLoad-in and show rarely share a feed well
The site decides between house circuits, a tie-in and a generator.
Three sources, and which one a job gets is set by the total load against what the site can already offer.
- The room’s own circuits
A small meeting or single-speaker session can sit on a ballroom’s convenience outlets if the total stays under a few 20A circuits and nothing else important shares them. It is the exception rather than the plan past a modest general session, because those outlets were wired for housekeeping, not a production.
- A tie-in from the building’s own service
Past that point the job comes off a company switch instead — one feed from the building’s service, then distro out to the show. Exhibit halls publish what they carry this way: Broward’s own first-level halls provide “100AMP 3 Phase service every 30 feet on center,” and Palm Beach County Convention Center’s floor pockets sit on the same 30-foot grid. A tie-in this size is planned in advance, not found on the day.
- A generator, where there is no service to tie into
A lawn, a pool deck, a closed street, a rooftop or a tented site has no service worth the name, so the power arrives on a truck — generator, distro and the tech who runs the numbers. It is sized on the maximum load plus headroom, in a range that runs from 6 kW to 80 kW depending on what the day needs, and it burns closer to the average once the show is running — the difference between sizing a machine and fuelling one.
- What the choice is never based on
Not on what is easiest to order. A generator brought in for a space that already has adequate service is a wasted truck roll, and a ballroom’s outlets asked to carry a video-heavy general session are a breaker trip mid-program. The load calculation sets the source.
Sources — each building’s own published electrical service
Not every circuit gets a second feed. A few of them have to.
Redundancy is a decision about which few things cannot recover live, not a blanket doubling of every circuit on the load sheet.
- What has to be protected
The signal path a keynote cannot survive losing mid-sentence: the microphone system, the console, the video switcher or processor, and playback. Lose the wash on a side truss for four seconds and nobody in the room can tell you when it happened. Lose the console or the processor for four seconds and the show is visibly, audibly broken in front of everyone watching.
- What does not need it
House lighting wash, general power outlets, catering and most staging power tools can tolerate a short drop without the audience noticing or the program stopping — doubling every circuit to the console’s own standard adds cost without adding anything the calculation is meant to protect.
- How the protected path is built
A second, independently fed circuit for the critical chain, proved by pulling the primary in rehearsal and confirming the show keeps running rather than assuming the failover works. Outdoors, where there is no building service to split from, that second feed is a second generator rather than a second circuit off the same machine — a generator failure is not a breaker trip, and a single point of failure upstream defeats the redundancy downstream of it.
- Where it is decided
On the load sheet, discipline by discipline, before the show — not worked out live once something drops. Which feeds are protected is part of the same calculation as the total load, not a separate conversation added afterward.
Five things, and the source and the redundancy plan both follow.
The same five questions decide where the power comes from and which feeds get a second path.
- Indoors or out
Indoors, the space’s own service and any company switch nearby are on the table. Outdoors — a lawn, a deck, a closed street, a rooftop or a tented site — a generator is the plan from the first watt.
- What else is drawing on the same site
Audio, video, lighting, staging, tent HVAC and catering all land on one calculation rather than five separate ones, so what else is on site changes the total even where nothing about the show itself has.
- What cannot be interrupted
A keynote, a live stream or a segment with no room to re-run decides which few feeds get a protected second path. Not every segment needs one, and naming which ones do is part of the scope.
- Load-in access, for a tie-in or a generator
Where the feed comes from and how far it has to run decide the distro and cable call — the distance to a company switch indoors, or where a generator can sit and how far its feeder has to reach outdoors.
- The date
Indoors that mostly affects space and crew availability; outdoors it is also a weather call on a generator sited to keep running through it.
Where the calculation turns into arithmetic.
A load number is only as good as the sheet it came off — the average-versus-maximum split for a wall, and what one house feed actually carries on an exhibit floor.
Send the site and the program. We will tell you what it needs.
Call and you will get someone who can tell you on the phone whether your space’s own circuits are enough. Or email the site, the load-in access and which segments cannot be interrupted, and we will come back with the source, the distro and the redundancy plan — no price guessed at before the load is calculated. Quotes within 24 hours.
- Phone
- (561) 750-4070
- [email protected]
- Shop
- 500 NE 28th Ct, Pompano Beach, FL 33064
- Service area
- South Florida · statewide in Florida